Past Community Development Projects
Public Utilities District


Blake Waterline 2006

In 2006 the Blake waterline project was completed. The project included a new booster station, new distribution and pump lines, new meters, and two new fire hydrants.



Klamath community Service District Feasibility Study 2007

In 2007 the Planning Department worked with the IHS and Kennedy-Jenks to conduct a feasibility study that explored the potential expansion of the KCSD wastewater system. The goal of the study was to determine possible alternatives and cost estimates to upgrade the current system.



Klamath Source Water 2007

The planning department contracted with the engineering firm Winzler and Kelly to study the ground water system in the Klamath glen. The project created a model of the aquifer and determined its recharge rate; this very important information to have when considering future development.




Project Links line
Planning electrical work.